INSTALLATIONS

Average installation on Cultured marble products is a week to a week and a half.  That’s producing the item, cleaning it, polishing it and installing it, once the order is placed and confirmed.

Quartz, Corian and Granite may take a little longer If the material has to be shipped in.

Installation time is about 2 weeks, again depending on availability of material.

Privacy and Cookie Policy